首页> 外文期刊>Power in Europe >EDF starts 97 MW hydro plant in French Alps costing Eur400 million
【24h】

EDF starts 97 MW hydro plant in French Alps costing Eur400 million

机译:EDF在法国阿尔卑斯山区开展97兆瓦水电站耗资4亿欧元

获取原文
获取原文并翻译 | 示例
           

摘要

A 97 MW hydro plant at Romanche-Gavet in the French Alps has been officially inaugurated after a 10-year construction period, operator EDF said Oct. 9.EDF CEO Jean-Bernard Levy and state secretary for rural development Joel Giraud opened the Eur400 million ($470 million) project in the Isere region between Grenoble and Alpe d'Huez. The plant increases by 40% power output of previous assets along the same stretch of the La Romanche river, EDF said, with a 10-km long underground conduit and generator inside the mountain replacing six old powerhouse generators and five dams.
机译:经营者EDF在10年10月9日举行后,在法国阿尔卑斯山区罗马海尔斯队的97兆瓦水力发电厂已正式落成。EDF首席执行官Jean-Bernard Levy和州农村发展局局长Joel Giraud在格勒诺布尔和Alpe D'Huez之间的Isere地区开设了4亿欧元(4.7亿美元)项目。 EDF说,该工厂以同样的沿着La Romanche河流沿着La Romanche River的相同资产的功率产量增加了40%的功率输出,在山上的一个10公里的地下管道和发电机,更换了六个旧的动力室发电机和五个水坝。

著录项

  • 来源
    《Power in Europe》 |2020年第833期|19-19|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号