...
首页> 外文期刊>Electric Utility Week >BC Hydro, British Columbia to slash energy use in 6,500 government buildings
【24h】

BC Hydro, British Columbia to slash energy use in 6,500 government buildings

机译:不列颠哥伦比亚省卑诗水电公司将削减6,500座政府建筑物的能源使用

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

BC Hydro and the British Columbia government have launched an ambitious plan to slash power use in 6,500 government and public buildings with a target to conserve 2,100 GWh within 12 years.The government intends to infuse C$200 million (US$203.3 million) into the program. But some C$250 million on power costs would be saved, estimates Bob Elton, president and CEO of Vancouver-based BC Hydro.The plan is the latest step in the BC government's goal to conserve power and to achieve energy self-sufficiency by 2016. The utility estimates that by 2020 the program would result in net savings of 342 GWh of power annually, enough to power 34,200 households. The cumulative amount of energy saved would reach 2,100 GWh.
机译:卑诗水电公司(BC Hydro)和不列颠哥伦比亚省政府已经启动了一项雄心勃勃的计划,以削减6500座政府和公共建筑的用电量,目标是在12年内节省2100 GWh,政府计划向该计划注入2亿加元(2.033亿美元)的资金。但温哥华卑诗水电公司总裁兼首席执行官鲍勃·埃尔顿(Bob Elton)估计,这将节省约2.5亿加元的电力成本。该计划是卑诗省政府到2016年实现节电,实现能源自给自足的目标的最新举措。该公用事业公司估计,到2020年,该计划将每年节省342 GWh的电力,足以为34,200户家庭供电。累计节省的能源量将达到2,100 GWh。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号