...
首页> 外文期刊>Electric Utility Week >Indiana Michigan Power scraps plans for wind RFP in lieu of developing wind power itself
【24h】

Indiana Michigan Power scraps plans for wind RFP in lieu of developing wind power itself

机译:印第安纳州密歇根电力公司取消了风能RFP计划,以取代自身发展的风能

获取原文
获取原文并翻译 | 示例

摘要

Looking to develop its own wind energy projects in Indiana, American Electric Power subsidiary Indiana Michigan Power has decided not to issue a formal solicitation this year to purchase up to 100 MW of wind power as a late 2007 integrated resource plan indicated it would (EUW, 10 Dec '07, 21). "We'd like to develop some wind power within our own service territory," I&M spokesman Michael Brian said last week. To prepare for that possibility, I&M has set up wind testing towers in Jay, Randolph and Wayne counties. They will monitor wind speeds and availability of the free energy source for at least another year. Then, the utility plans to review the results and determine how to proceed with a commercial wind energy project. The Indiana Utility Regulatory Commission last year approved I&M's first wind purchase - a 20-year, 100-MW acquisition from the Fowler Ridge Wind Farm under development in Benton and Tippecanoe counties in Indiana. BP Alternative Energy and its project partner, Dominion, began construction work on the wind farm, located about 90 miles northwest of Indianapolis, in early June.
机译:为了在印第安纳州发展自己的风能项目,美国电力公司的子公司印第安纳州密歇根州电力公司(印第安纳州密歇根州电力公司)决定今年不发出正式招标书,要求购买不超过100兆瓦的风能,这是由于2007年底的综合资源计划表明将(EUW, 2007年12月10日,21)。 I&M发言人迈克尔·布莱恩(Michael Brian)上周表示:“我们希望在自己的服务范围内开发一些风力发电。”为了为这种可能性做准备,I&M已在Jay,Randolph和Wayne县建立了风力测试塔。他们将至少监测风速和免费能源的可用性。然后,公用事业公司计划审查结果并确定如何进行商业风能项目。去年,印第安纳州公用事业监管委员会批准了I&M的第一笔风电采购-从印第安纳州本顿县和Tippecanoe县正在开发的Fowler Ridge风电场进行为期20年,100兆瓦的收购。 BP替代能源公司及其项目合作伙伴Dominion于6月初开始在印第安纳波利斯西北约90英里处的风电场进行建设工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号