...
首页> 外文期刊>Platts Electric Utility Week >Smart grid Catch-22: Utilities must have plans even as vital standards still being developed
【24h】

Smart grid Catch-22: Utilities must have plans even as vital standards still being developed

机译:智能电网Catch-22:即使仍在制定重要标准,公用事业也必须制定计划

获取原文
获取原文并翻译 | 示例
           

摘要

State regulators are telling utilities to develop broad smart ngrid plans that encompass all kinds of elements about how nadvanced meters and other technologies will be used. At the nsame time, though, smart grid standards are still being hatched nby the federal government.nSome utilities think they are being put in a Catch-22 bind.nThat dynamic was addressed indirectly last week at the nannual meeting of the National Association of Regulatory Utility nCommissioners, where a number of speakers told state regula-ntors that they should not allow utilities to install advanced nmeters first and figure out later how best to use them.
机译:州监管机构要求公用事业公司制定广泛的智能ngrid计划,其中包括有关如何使用智能电表和其他技术的所有要素。然而,在同一时间,联邦政府仍在孵化智能电网标准.n一些公用事业公司认为它们被置于Catch-22约束中.n上周在美国国家监管协会年度会议上间接解决了这一动态问题Utility nCommissioners,许多发言者告诉州监管者,他们不应该允许公用事业先安装高级仪表,然后再弄清楚如何最好地使用它们。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号