...
首页> 外文期刊>Platts Electric Utility Week >entergy stakeholders still impatient, but group of states wins ability to make filings to FeRC
【24h】

entergy stakeholders still impatient, but group of states wins ability to make filings to FeRC

机译:积极的利益相关者仍然不耐烦,但一些州赢得了向联邦紧急事务委员会备案的能力

获取原文
获取原文并翻译 | 示例

摘要

A number of stakeholders in Entergy territory told a panel of nstate regulators last week that they do not want to wait until a ndecision is made about joining a regional transmission organiza-ntion to address longstanding transmission access issues.nIn an Entergy Regional State Committee meeting in Austin, nTexas, Jennifer Vosburg, director of regulatory and governmen-ntal affairs for NRG Energy’s New Roads, Louisiana, generation nunit, made a presentation about what stakeholders intend to do nduring a proposed two-year extension of Southwest Power Pool’s nterm as Entergy’s independent coordinator of transmission.
机译:Entergy领土上的许多利益相关者上周告诉nstate监管机构小组,他们不想等到就加入区域性传输组织以解决长期的传输访问问题做出决定时。 NRG能源公司路易斯安那州NRG能源公司New Roads的法规和政府事务主管,nTexas州奥斯汀市的詹妮弗·沃斯堡(Jennifer Vosburg)进行了演讲,介绍了利益相关者打算为西南电力公司(Southwest Power Pool)nterm作为Entergy的独立公司提议延长两年的提议传播协调员。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号