首页> 外文期刊>Platts Electric Utility Week >Entergy texas asks PuC to approve recovery of capacity costs via riders, not in base rates
【24h】

Entergy texas asks PuC to approve recovery of capacity costs via riders, not in base rates

机译:Entergy Texas要求PuC批准通过骑行者收回容量成本,而不是以基本费率

获取原文
获取原文并翻译 | 示例
           

摘要

Entergy Texas asked the Public Utility Commission to ndevelop and approve a new rule that would permit utilities to nrecover their purchased power capacity costs through annual nrate adjustments and true-ups, rather than through base rates.
机译:德克萨斯州Entergy公司要求公共事业委员会制定并批准一项新规则,该规则将允许公共事业通过年度利率调整和调整而不是通过基本费率来收回购买的电力容量成本。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号