首页> 外文期刊>Platts Electric Utility Week >Ls Power unit seeks incentive rates for Illinois line, citing risk of status as economic project
【24h】

Ls Power unit seeks incentive rates for Illinois line, citing risk of status as economic project

机译:Ls Power部门以存在经济项目身份的风险为由,寻求伊利诺伊州铁路的激励价格

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The would-be developer of a merchant transmission line in nIllinois has asked the Federal Energy Regulatory Commission nfor a tailored package of incentive rates, saying the project faces nextraordinary hurdles.nCentral Transmission has submitted the Valley Project, n30-50 miles of 345-kV single-circuit line, for inclusion in the nPJM Interconnection 2010 regional transmission expansion nplan, it said in the February 8 petition (Docket No. EL11-21). nCentral is a subsidiary of LS Power Group.
机译:打算在伊利诺伊州进行商业输电线路的开发商已向联邦能源管理委员会要求提供量身定制的激励方案,称该项目面临下一个主要障碍。它在2月8日的请愿书(文件号:EL11-21)中表示,将单线线路纳入nPJM Interconnection 2010区域传输扩展nplan中。 nCentral是LS Power Group的子公司。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号