...
首页> 外文期刊>Plant & civil engineer >New Topcon technology improves efficiency for McAuliffe Group
【24h】

New Topcon technology improves efficiency for McAuliffe Group

机译:新的拓普康技术提高了麦考利夫集团的效率

获取原文
获取原文并翻译 | 示例
           

摘要

Despite the construction sites being located in Telford, Wrexham and Manchester, for the most part, he has not had to leave his office in Wolverhampton. The contracts are diverse in nature, miles apart geographically and programmes are tight, but Dean, taking the role of engineer and project manager, is able to accurately measure progress on all three sites remotely through the use of specialist construction equipment supplier Topcon's "Sitelink" site management system. The Telford project involves removing 12,000m3 of rock material from the site to predetermined minimum depths to allow roads, foundations and an underground sewer network to be installed for a new housing development. Sitelink is being used on the project to relay excavation progress to head office. Topcon's 3D GPS instrumentation on two of McAuliffe's machines measure the line and level of the excavation while a Topcon base station on site ensures GPS readings are accurate to approx 20mm.
机译:尽管大部分建筑工地位于德福,雷克瑟姆和曼彻斯特,但他不必离开沃尔夫汉普顿的办公室。合同的性质各不相同,地理上相距遥远,并且计划很紧张,但是Dean担任工程师和项目经理,可以通过使用专业建筑设备供应商Topcon的“ Sitelink”来准确地远程衡量所有三个地点的进度网站管理系统。特尔福德项目涉及从现场清除12,000m3的岩石材料至预定的最小深度,以便为新的房屋开发安装道路,地基和地下下水道网络。该项目使用Sitelink将开挖进度传达给总部。两台McAuliffe机器上的Topcon 3D GPS仪器可测量挖掘的线和高度,而现场的Topcon基站可确保GPS读数精确到约20mm。

著录项

  • 来源
    《Plant & civil engineer》 |2015年第janaafeba期|76-76|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号