首页> 外文期刊>pipes and pipelines international >China moves ahead with construction of national gas pipeline grid
【24h】

China moves ahead with construction of national gas pipeline grid

机译:中国推进国家天然气管道网建设

获取原文
获取原文并翻译 | 示例
           

摘要

CHINA’S PLANS to achieve long term energy supply security recently took an important step forward withnthe official opening in December of the Trans-Asian Gas Pipeline built to transport gas from Turkmenistannto China which crosses Uzbekistan and Kazakhstan along its 1,830km route. China will import 40 billionncubic metres (bcm) a year of gas from Turkmenistan under a new contract signed by China National PetroleumnCorporation (CNPC) and state-run Turkmengaz in June 2009 replacing the original sales contract for 30 bcmna year signed in 2007.
机译:自12月正式开放的泛亚天然气管道建成以来,中国实现长期能源供应安全的计划向前迈出了重要的一步。该管道用于从土库曼斯坦至中国的天然气运输,该管道穿越乌兹别克斯坦和哈萨克斯坦,全长1,830公里。根据中国石油天然气集团公司(CNPC)与国有土库曼斯坦于2009年6月签署的新合同,中国将每年从土库曼斯坦进口400亿立方米天然气,以取代2007年签订的每年30立方米天然气的原始销售合同。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号