...
【24h】

TAP enters critical period

机译:TAP进入关键时期

获取原文
获取原文并翻译 | 示例
           

摘要

The Trans Adriatic Pipeline (TAP) is an 878 km pipeline that will transport gas from the Shah Deniz II field in Azerbaijan through the European section of the Southern Gas Corridor, a 3,500 km system providing a gateway to deliver up to 10 billion m'/a of new Caspian gas supplies to Europe from 2020. Gas is first transported from Shah Deniz II, a US$28 billion subsea development in the Caspian Sea, via the 692 km South Caucasus Pipeline, then connected to the Trans Anatolian Natural Gas Pipeline (TANAP) at the Turkish-Georgian border. From there, product is moved more than 1,800 km to Kipoi, Greece, where TAP begins, with the gas then transported to Italy's gas transportation network in the south of the country, via Albania.
机译:跨亚得里亚海管道(TAP)是一条878公里的管道,将从阿塞拜疆的Shah Deniz II气田通过南部天然气走廊的欧洲部分输送天然气,该系统全长3500公里,提供了一个高达100亿m'/从2020年开始向欧洲提供新的里海天然气供应。天然气首先通过692公里的南高加索管道从里海海底开发项目Shah Deniz II进行运输,耗资280亿美元,然后与跨安那托利亚天然气管道(TANAP)连接)在土耳其格鲁吉亚边界。从那里开始,产品被输送到1800公里以上的希腊基波伊(Kipoi),TAP在那里开始,然后通过阿尔巴尼亚将天然气输送到该国南部的意大利天然气运输网络。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号