【24h】

Government

机译:政府

获取原文
获取原文并翻译 | 示例
       

摘要

While distribution companies and state regulators seem satisfied with the general outlines of the proposed distribution integrity management program (DIMP) announced June 25 by the Pipeline and Hazardous Materials Safety Administration (PHMSA), several questions are being raised by both groups about some of the proposal's murky details. The American Gas Association (AGA) held a workshop in Chicago on the DIMP Aug. 12-13 that 120 people attended, including PHMSA officials and representatives of the National Association of Pipeline Safety Representatives (NAPSR). There were rumblings in the corridors. Subsequently, the AGA and NAPSR asked PHMSA to extend the comment deadline, which PHMSA did, from Sept. 23 to Oct. 23.
机译:尽管管道公司和州监管机构对6月25日管道和危险材料安全管理局(PHMSA)宣布的拟议的配电完整性管理计划(DIMP)的总体概述感到满意,但两个小组仍对该提案的某些问题提出了若干问题。模糊的细节。美国天然气协会(AGA)于8月12日至13日在芝加哥举行了DIMP研讨会,共有120人参加,其中包括PHMSA官员和美国国家管道安全代表协会(NAPSR)的代表。走廊里有隆隆声。随后,AGA和NAPSR要求PHMSA将评论截止日期从9月23日延长至10月23日,PHMSA这样做了。

著录项

  • 来源
    《Pipeline & gas journal》 |2008年第10期|8|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:18:16

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号