首页> 外文期刊>Pipeline & gas journal >Innovative Stopple~r Train Plugging System Achieves Double Block And Bleed
【24h】

Innovative Stopple~r Train Plugging System Achieves Double Block And Bleed

机译:创新的堵漏火车堵塞系统实现了双重堵塞和流血

获取原文
获取原文并翻译 | 示例
           

摘要

Whether it's routine maintenance or an emergency repair, work done on a pressurized piping system requires both excellent equipment and proper procedure. The work might take place on a remote section of transmission pipeline far removed from the nearest city, deep below the surface of an ocean, or in the middle of a busy chemical processing plant, but wherever it is, modifications to any active line must be done with the utmost care, and with all appropriate safety measures in place.rnBecause they typically require high concentrations of personnel and large infrastructure investments in a highly volatile environment, hydrocarbon processing facilities such as refineries are increasingly seeking out a double block and bleed option when isolating a section of an active line for repairs or additions without interruption of service.
机译:无论是常规维护还是紧急维修,在加压管道系统上进行的工作都需要出色的设备和适当的程序。这项工作可能在远离最近城市,远低于海洋表面或在繁忙的化学加工厂中间的输油管道的偏远地区进行,但是无论在哪里,都必须对任何活动管线进行修改由于它们通常需要高度集中的人员和在高度动荡的环境中进行大量的基础设施投资,因此,炼油厂等碳氢化合物加工设施越来越多地寻求双重封堵和放气的选择在不中断服务的情况下,隔离活动线路的一部分以进行维修或增加。

著录项

  • 来源
    《Pipeline & gas journal》 |2009年第1期|7072|共2页
  • 作者

    Frank Dum; T.D. Williamson;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号