【24h】

Offshore

机译:离岸

获取原文
获取原文并翻译 | 示例
       

摘要

Shell Oil Company has made a final investment decision for its Mars B deepwater development, located 130 miles south of New Orleans, LA in the Gulf of Mexico. The development will include a second tension-leg platform, named Olympus, to enhance recovery from the prolific Mars field. The new platform will also provide process infrastructure for two of Shell's recent deepwater discoveries, West Boreas and South Deimos, and can potentially serve the nearby, rich exploration portfolio in the Gulf of Mexico. The tension-leg platform is a proven concept which Shell first executed in the early '90s for its Auger hub. Shell then followed with deepwater, tension-leg platforms for its Mars "A", Ram-Powell, Ursa, and Brutus developments. First production from the Mars B Olympus platform is expected in 2015; the facility will be designed to process 100,000 boed.
机译:壳牌石油公司(Shell Oil Company)已对其位于墨西哥湾新奥尔良以南130英里的Mars B深水开发项目做出了最终投资决定。该开发项目将包括一个名为Olympus的第二条张力腿平台,以增强从多产的火星油田的恢复能力。新平台还将为壳牌公司最近在西博里亚斯和南迪莫斯的两个深水发现提供工艺基础设施,并有可能为墨西哥湾附近丰富的勘探组合提供服务。腿部张紧平台是一种行之有效的概念,壳牌在90年代初就对其Auger集线器首次执行了该概念。壳牌随后为其火星“ A”,Ram-Powell,Ursa和Brutus开发项目配备了深水,张紧腿平台。火星B奥林巴斯平台预计将于2015年首次量产;该设施将设计成可处理100,000个boed。

著录项

  • 来源
    《Pipeline & gas journal》 |2010年第11期|p.76-77|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:17:52

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号