首页> 外文期刊>Pipeline & gas journal >Take A BIG First Gas Pressure Cut To Protect Delivery System
【24h】

Take A BIG First Gas Pressure Cut To Protect Delivery System

机译:首次大气压削减以保护输送系统

获取原文
获取原文并翻译 | 示例
       

摘要

Despite the higher gas pipeline pressures (up to 1,000 psi) and varying inlet pressures on peak days in recent years, Wisconsin Public Service Corporation believes the most effective pressure-reduction practice is to take a first cut from the supply pipeline in one big step while sizing for minimum contract pressure. This operating philosophy makes sense because single-step pressure reduction is less complicated and allows us to use smaller valves and get more capacity than with multiple pressure cuts requiring larger valves. In some cases, building another regulation run/cut may be unnecessary. The company expects lower installation costs and lower overall cost of ownership over the long term.
机译:威斯康星州公共服务公司(Visconsin Public Service Corporation)认为,尽管近年来天然气管道的压力较高(最高可达1,000 psi),并且进气压力在高峰日变化不定,但最有效的降压措施是首先大步减少供应管道的压力。调整以最小的合同压力。这种操作原理是有道理的,因为单步减压的复杂性降低了,并且与需要更大阀门的多次减压相比,我们可以使用更小的阀门并获得更大的容量。在某些情况下,可能无需构建其他规则运行/剪切。该公司期望长期降低安装成本并降低总体拥有成本。

著录项

  • 来源
    《Pipeline & gas journal》 |2011年第12期|p.5052|共2页
  • 作者

    Jerry Peot;

  • 作者单位

    Senior Gas Engineer, Wisconsin Public Service Corporation, Green Bay, Wl;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:17:40

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号