首页> 外文期刊>Pipeline & gas journal >Enterprise Holds Open Commitment Period For Texas Express Pipeline Capacity
【24h】

Enterprise Holds Open Commitment Period For Texas Express Pipeline Capacity

机译:企业为得克萨斯州快速管道产能保持开放承诺期

获取原文
获取原文并翻译 | 示例
       

摘要

Enterprise Products Partners L.P., through its Texas Express Pipeline LLC subsidiary, held a binding open commitment period for available capacity on a NGL pipeline being developed by the company. The pipeline would originate from Skellytown. TX in Carson County and extend approximately 580 miles to NGL fractionation and storage facilities in Mont Belvieu. TX. The project is part of a recently announced joint venture that includes Enbridge Energy Partners, L.P. and Anadarko Petroleum.
机译:Enterprise Products Partners L.P.通过其Texas Express Pipeline LLC子公司为该公司正在开发的NGL管道的可用容量举行了具有约束力的开放承诺期。该管道将​​始于Skellytown。位于卡森县的TX,延伸至Mont Belvieu的NGL分馏和储存设施约580英里。 TX。该项目是最近宣布的合资企业的一部分,该合资企业包括Enbridge Energy Partners,L.P。和Anadarko Petroleum。

著录项

  • 来源
    《Pipeline & gas journal》 |2011年第11期|p.14|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:17:40

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号