首页> 外文期刊>Pipeline & gas journal >Nicor Announces Construction Phase Of Gas Storage Facility
【24h】

Nicor Announces Construction Phase Of Gas Storage Facility

机译:Nicor宣布天然气存储设施的建设阶段

获取原文
获取原文并翻译 | 示例
       

摘要

Nicor Inc.'s subsidiary Central Valley Gas Storage L.L.C. has begun the construction phase of its planned natural gas storage facilities located in Colusa County, CA. The project is a high-deliverability depleted reservoir that will provide multi-turn services tailored to customers' requirements. This project is expected to be completed by year-end. Work includes installing compressor units and constructing 15 miles of 24-inch pipeline connecting the storage field to PG&E's transmission system. Once completed, the facility will have a storage capacity of 11 Bcf and an injection and withdrawal capacity of 300 MMscf/d.
机译:Nicor Inc.的子公司Central Valley Gas Storage L.L.C.位于加利福尼亚州库卢萨县的已计划天然气存储设施的建设阶段已经开始。该项目是高输送能力枯竭的油藏,将提供根据客户要求量身定制的多回转服务。该项目预计将在年底完成。工作包括安装压缩机组和建造15英里长的24英寸管道,将存储区域连接到PG&E的传输系统。一旦建成,该设施将具有11 Bcf的存储容量和300 MMscf / d的注入和抽取容量。

著录项

  • 来源
    《Pipeline & gas journal》 |2011年第6期|p.12|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:17:38

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号