【24h】

PROJECTS

机译:工程项目

获取原文
获取原文并翻译 | 示例
       

摘要

Williams Partners' Transcontinental Gas Pipe Line Company filed an application with the Federal Energy Regulatory Commission (FEREC) to construct a 475,000 Dth/d expansion in Texas and Louisiana to connect natural gas supplies with global LNG markets. Constructed in two phases, the proposed Gulf Connector Project is designed to deliver 75,000 Dth/d to Freeport LNG Development's liquefaction project by the second half of 2018, and 400,000 Dth/d to Cheniere Energy's Corpus Christi liquefaction terminal in 2019. Pending regulatory approvals, construction on the first phase of the project will begin in the third quarter of 2017 in order to be placed into service during the second half of 2018.
机译:威廉姆斯合伙人公司的横贯大陆天然气管道公司向联邦能源管理委员会(FEREC)提出了在德克萨斯州和路易斯安那州建造475,000 Dth / d扩建设备的申请,以将天然气供应与全球LNG市场联系起来。拟议中的海湾连接器项目分两个阶段进行建设,旨在到2018年下半年向Freeport LNG Development的液化项目交付75,000 Dth / d,并于2019年向Cheniere Energy的Corpus Christi液化终端交付400,000 Dth / d。待监管部门批准,该项目第一阶段的建设将于2017年第三季度开始,以便于2018年下半年投入使用。

著录项

  • 来源
    《Pipeline & gas journal》 |2016年第10期|1012|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:16:41

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号