【24h】

PROJECTS

机译:工程项目

获取原文
获取原文并翻译 | 示例
       

摘要

Jemena has received approval from Australia's Northern Territory Government to construct the first 214-mile section of the $800 million Northern Gas Pipeline Project, a 386-mile pipeline that will connect Tennant Creek in the Northern Territory to Mount Isa in Queensland. Jemena awarded a construction contract for the project to McConnell Dowell. Its scope of work involves the engineering, construction and commissioning of a 299-mile section of the line. Site activities are expected to start in the coming weeks, with the first gas expected to run through the pipeline in late 2018. About 150 miles of the pipeline is expected to be laid in 2017, with the project anticipated to be placed in service in 2018. Upon completion, the project will, for the first time, connect Northern Territory gas fields with the east-coast gas market.
机译:Jemena已获得澳大利亚北领地政府的批准,用于建设耗资8亿澳元的北部天然气管道项目的第214英里部分,该管道长386英里,将连接北领地的Tennant Creek和昆士兰州的伊萨山。杰梅纳(Jemena)向麦康奈尔道威尔(McConnell Dowell)授予了该项目的建筑合同。它的工作范围涉及该线299英里部分的工程,建设和调试。现场活动预计将在未来几周内开始,首批天然气预计在2018年底通过管道。预计在2017年铺设约150英里的管道,该项目预计在2018年投入使用。完成后,该项目将首次将北领地天然气田与东海岸天然气市场连接起来。

著录项

  • 来源
    《Pipeline & gas journal》 |2017年第7期|12-14|共3页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:16:30

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号