首页> 外文期刊>Pipeline & gas journal >Starling Pipe-in-Pipe Project Copes with Stresses of S-Lay Pipelaying
【24h】

Starling Pipe-in-Pipe Project Copes with Stresses of S-Lay Pipelaying

机译:椋鸟管道工程用S铺设管道的应力应对

获取原文
获取原文并翻译 | 示例
           

摘要

As the pressure increases to develop more and more marginal fields with high-pressure, high-temperature (HPHT) wells, and as new technologies develop, pipe-in-pipe will continue to grow in importance in the years ahead.By working in partnership with customers at an early stage in the engineering process, Tata Steel can offer significant benefits and expertise to ensure that the optimal pipeline insulation system is developed, meeting the specific requirements of each challenging project.
机译:随着压力的增加,以高压,高温(HPHT)井的越来越多的边缘场,随着新技术的发展,管道管道将在未来几年继续在重要性中生长。通过在工程过程的早期阶段与客户合作,塔塔钢可以提供显着的好处和专业知识,以确保开发出最佳的管道绝缘系统,满足每个具有挑战性项目的具体要求。

著录项

  • 来源
    《Pipeline & gas journal》 |2020年第8期|49-51|共3页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号