首页> 外文期刊>Pipeline & Gas Journal >New Guidelines For Float-Over Installations And Moorings
【24h】

New Guidelines For Float-Over Installations And Moorings

机译:浮上安装和系泊的新准则

获取原文
获取原文并翻译 | 示例
       

摘要

GL Noble Denton has issued new guidelines for float-over installations and for moorings. They are now available for oil and gas companies, designers and contractors and describe "industry good practice" which help companies to have their mooring systems or float-over operations approved by GL Noble Denton. An approval by GL Noble Denton may be a requirement of an insurance warranty or to ensure that operational risks are as low as possible.
机译:GL Noble Denton发布了有关浮标安装和系泊的新指南。现在,它们可供石油和天然气公司,设计师和承包商使用,并描述了“行业良好实践”,可帮助公司的系泊系统或GL Noble Denton批准的上浮作业。 GL Noble Denton的批准可能是一项保险保证的要求,或者是为了确保操作风险尽可能低。

著录项

  • 来源
    《Pipeline & Gas Journal》 |2011年第3期|p.106-106|共1页
  • 作者

    Anonymous;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 13:43:54

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号