Scheduling Post-disaster Repairs in Electricity Distribution Networks with Uncertain Repair Times

机译:在具有不确定修复时间的电力分配网络中调度灾后维修

获取原文
获取原文并翻译 | 示例
           

摘要

Natural disasters, such as hurricanes, large wind and ice storms, typically require the repair of a large number of components in electricity distribution networks. Since power cannot be restored before the completion of repairs, optimally scheduling the available crews to minimize the cumulative duration of the customer interruptions reduces the harm done to the affected community. We have previously proposed approximation algorithms to schedule post-disaster repairs in electricity distribution networks with complete damage information [1]. In this paper, we extend our previous work to the case with incomplete damage information. We model this problem as scheduling a set of jobs with stochastic processing times on parallel identical machines in order to minimize the total weighted energization time. A linear programming (LP) based list scheduling policy is proposed and then analyzed in terms of theoretical performance.
机译:自然灾害,如飓风,大风和冰暴,通常需要修复电力分配网络中的大量组件。由于在完成维修之前无法恢复电源,最佳地调度可用的人员以最大限度地减少客户中断的累积持续时间,从而降低了对受影响的社区所做的危害。我们之前提出了近似算法,以提出具有完全损坏信息的电力分配网络中的灾后维修[1]。在本文中,我们将以前的工作扩展到不完整的损坏信息。我们将该问题模拟了该问题,如同在并行相同机器上的随机处理时间调度一组作业,以便最小化总加权通电时间。提出了基于线性编程(LP)列表调度策略,然后在理论性能方面进行分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号