Lateral Load Tests on Prestressed Concrete Piles Supporting Integral Abutments

机译:支撑整体式基台的预应力混凝土桩的侧向荷载试验

获取原文
获取原文并翻译 | 示例
           

摘要

Four prestressed concrete piles, 14 in. (356 mm) square, were driven 36 ft (11 m) into undisturbed clay soil in a research project sponsored by the Tennessee Department of Transportation (TOOT). Each pile supported a simulated integral abutment 3 ft (0.91 m) thick. The abutment was 10 ft (3.05 m) wide and was cast integrally with an abutment slab which was 2.5 ft (0.76 m) thick. The slab-abutment system was pulled horizontally, displacing the pile laterally and thus inducing moments and shears along a portion of the pile. The abutment slab was restrained against free rotation in a way to simulate the behavior of an abutment in an actual bridge. Each pile was subjected to a number of lateral load tests to a displacement of 1.0 in. (25.4 mm), consistent with TDOT's design cfiteria, and then were subjected to a number of more stringent tests. One pile was cycled approximately 100 times to a displacement slightly more than 1.0 in. (25.4 mm), and another pile was pulled laterally to failure. The results of the tests clearly indicate that prestressed concrete piles are appropriate for use in integral abutment bridges and that the TDOT design criteria are conservative.
机译:在田纳西州交通部(TOOT)赞助的一项研究项目中,将14英寸(356毫米)平方英寸的四个预应力混凝土桩推入了11英尺(36英尺)的原状粘土中。每个桩都支撑着3英尺(0.91 m)厚的模拟整体式基台。该基台宽10英尺(3.05 m),并与2.5英尺(0.76 m)厚的基台板整体浇铸。平板-基台系统被水平拉动,使桩向侧面移动,从而沿桩的一部分引起力矩和剪切力。以模拟实际桥梁中的桥台行为的方式,限制了桥台板的自由旋转。根据TDOT的设计标准,对每个桩进行了1.0英寸(25.4毫米)位移的许多横向载荷测试,然后进行了许多更严格的测试。将一个桩循环大约100次,使其位移略大于1.0英寸(25.4毫米),然后将另一个桩横向拉至破坏。测试结果清楚地表明,预应力混凝土桩适合用于整体式桥台,并且TDOT设计标准是保守的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号