...
首页> 外文期刊>PCI Journal >WEKIVA PARKWAY #204 SYSTEMS INTERCHANGE
【24h】

WEKIVA PARKWAY #204 SYSTEMS INTERCHANGE

机译:Wekiva Parkway#204 Systems Interchange

获取原文
获取原文并翻译 | 示例
           

摘要

When Orange County, Fla., needed a new interchange to relieve traffic congestion and provide fully directional access between two state expressways, it turned to the Florida Department of Transportation (FDOT) for help. FDOT agreed to provide a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan, which is designed to give credit assistance for qualified projects of regional significance.The loan would help Orange Country deliver the Central Florida Expressway (CFX) with savings of approximately $260 million through bond interest payments. However, the project team had to meet the completion deadline to get the money.
机译:当奥兰治县,佛罗里达州时,需要一个新的交换来缓解交通拥堵,并在两个国家高速公路之间提供完全定向的访问,它转向佛罗里达州的运输部(FDOT)寻求帮助。 FDOT同意提供交通基础设施财务和创新法案(TIFIA)贷款,旨在为区域意义的合格项目提供信贷援助。贷款将帮助橙色国家提供佛罗里达州中央高速公路(CFX),节省约2.6亿美元,通过债券利息支付。但是,项目团队必须达到完成截止日期以获得赚钱。

著录项

  • 来源
    《PCI Journal》 |2020年第3appa期|44-45|共2页
  • 作者

    James Nelson;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号