1. GAU-19/A production continues on an as-needed basis, primarily for export.rn2. Continued hopes for GAU-19/A integration with the MV-22 Osprey drive serial production.rn3. Production forecast reflects contractor's anticipated procurement for a potential MV-22 requirement, as well as for whatever aircraft may ultimately fill the void left by the U.S. Army's canceled ARH program.
展开▼