...
首页> 外文期刊>Offshore >ATP converts semi for fast-track deepwater development
【24h】

ATP converts semi for fast-track deepwater development

机译:ATP将半成品转化为快速的深水开发

获取原文
获取原文并翻译 | 示例

摘要

With limited infrastructure in the vicinity and an aggressive schedule to first production, ATP elected to develop its Gomez field in the Gulf of Mexico with a converted semisub-mersible rig, a solution that hadn't been used in the Gulf since 1995. The nearest platform for tieback was over 48 km (30 mi) away, which would have introduced a lot of flow assurance problems," says RM Shivers Ⅲ, ATP vice president of projects and Gomez project manager.
机译:由于附近的基础设施有限,并且开始生产的时间表很紧迫,ATP选择了在墨西哥湾的Gomez油田开发改建的半潜式钻井平台,该解决方案自1995年以来就没有在海湾地区使用过。绑扎平台的距离超过48公里(30英里),这会带来很多流量保证问题,” ATP项目副总裁兼戈麦斯项目经理RM ShiversⅢ说。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号