首页> 外文期刊>Offshore >JUMBO OFFSHORE PLAYS LEADING ROLE IN INSTALLATION OF FREE-STANDING HYBRID RISERS. BUOYANCY CANS AT CASCADE AND CHINOOK
【24h】

JUMBO OFFSHORE PLAYS LEADING ROLE IN INSTALLATION OF FREE-STANDING HYBRID RISERS. BUOYANCY CANS AT CASCADE AND CHINOOK

机译:巨型海上平台在安装自由站立的混合上升管方面发挥着主导作用。卡萨德和奇诺克的浮力罐

获取原文
获取原文并翻译 | 示例
           

摘要

For the production risers employed at Petrobras America inc.'s Cascade and Chinook ultra-deepwater fields, Technip USA, EPIC contractor, chose Jumbo Offshore to support transportation and installation of the project's five Free Standing Hybrid Risers (FSHRs) comprised of four 7 inch ID units for liquids production and one 6 inch ID unit for handling natural gas export. The Cascade and Chinook FSHRs are the deepest ever installed, as well as the first in the Gulf of Mexico to be connected to a Floating Production, Storage and Offloading (FPSO) vessel. Installation took place during the period August-December 2009.
机译:对于在Petrobras America Inc.的Cascade和Chinook超深水油田使用的生产提升管,EPIC承包商Technip USA选择了Jumbo Offshore来支持该项目的五台独立式混合立管(FSHR)的运输和安装,这些立管由四个7英寸的用于生产液体的ID装置和一个用于处理天然气出口的6英寸ID装置。 Cascade和Chinook FSHR是有史以来安装最深的,也是墨西哥湾中最早与浮式生产,储存和卸货(FPSO)船连接的装置。安装在2009年8月至12月进行。

著录项

  • 来源
    《Offshore》 |2012年第4suppla期|p.70-71|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号