...
首页> 外文期刊>Offshore >Joint industry project seeks to advance subsea standardization
【24h】

Joint industry project seeks to advance subsea standardization

机译:联合工业项目寻求推进海底标准化

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Subsea production systems are an integral part of FPSO and other floater-based field developments, as well as for new tie-ins to old installations. Over the past 15 years, subsea technology has moved from subsea wells, manifolds, flowlines, and templates, to include subsea boosting, separation, and now compression. In the near future, deepwater wells will require more complex subsea equipment. Looking further ahead, the industry expects to see automated production entirely located on the seabed, piping oil and gas directly to shore through the "subsea factory" concept. The recent downturn in the oil and gas market has led to a greater focus on cost efficiency. Though cost has always been an integral part of offshore field development, falling oil prices have forced the subsea industry to reassess what counts as best practice in the manufacturing and employment of subsea equipment. To this end, the industry has begun a series of joint industry projects (JIPs), led by DNV GL, to set guidelines and recommended practices in five areas: re-engineering, workovers, component catalogues, compliance with established standards, and standardized documentation. A sixth JIP, dealing with specifications for forgings, has already resulted in a new recommended practice.
机译:水下生产系统是FPSO和其他基于浮子的现场开发不可或缺的一部分,并且是与旧设备的新结合。在过去的15年中,海底技术已经从海底井,歧管,流水线和模板转移到了海底增压,分离和压缩方面。在不久的将来,深水井将需要更复杂的海底设备。展望未来,该行业希望看到自动化生产完全位于海床上,通过“海底工厂”概念将石油和天然气直接输送到岸上。近期石油和天然气市场的低迷导致人们更加关注成本效率。尽管成本一直是海上油田开发不可或缺的一部分,但油价下跌迫使海底行业重新评估海底设备制造和使用中的最佳做法。为此,该行业已开始由DNV GL牵头的一系列联合行业项目(JIP),以在五个领域设定指导方针和推荐做法:重新设计,维修,零件目录,符合既定标准和标准化文档。第六份关于锻件规格的JIP已经提出了新的推荐做法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号