首页> 外文期刊>Offshore Wind Journal >'Give us certainty to ensure growth' say leaders
【24h】

'Give us certainty to ensure growth' say leaders

机译:领导人说:“给我们确定性以确保增长”

获取原文
获取原文并翻译 | 示例
           

摘要

Talk of long-term funding certainty dominated the agenda item at Scottish Renewables' Offshore Wind and Supply Chain Conference at the end of January, as the sector stood poised for the results of contract for difference (CFD) deliberations. As highlighted elsewhere in this issue of OWJ, the government in the UK recently made available £25 million more for the first CFD auction round, adding to the £235 million originally made available for 'less mature technologies', including offshore wind. Prior to the addition of the new funds, the overall sum available was expected to allow for about 800 megawatts of offshore wind power, which could equate to a single large offshore wind project rather than projects. The additional £25 million was welcome but is unlikely to make a significant difference to the number of projects that get the go ahead.
机译:1月底,在苏格兰可再生能源公司的海上风能和供应链会议上,关于长期资金确定性的讨论占据了议程项目的主导地位,因为该行业已准备好进行差价合约(CFD)审议的结果。正如本期《 OWJ》中其他地方所强调的那样,英国政府最近为CFD的第一轮拍卖提供了2500万英镑,而最初为包括海上风电在内的“较不成熟的技术”提供了2.35亿英镑。在添加新资金之前,预计可用的总金额将允许约800兆瓦的海上风电,这可能相当于一个大型海上风电项目,而不是项目。额外的2500万英镑值得欢迎,但不太可能对继续进行的项目数量产生重大影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号