...
首页> 外文期刊>Offshore Support Journal >Tasik Toba making good progress
【24h】

Tasik Toba making good progress

机译:鸟羽湖进展顺利

获取原文
获取原文并翻译 | 示例
           

摘要

At a ceremony held at Fujian Mawei Shipyard in Fuzhou, China, on 25 August 2015, first steel was struck for Tasik Toba by founder and CEO of Tasik Subsea John Giddens. The company said the vessel is "already ahead of schedule". It is a 105m dynamic positioning class 3 subsea vessel with built-in saturation and air diving with full dual remotely operated vehicle capability. Tasik Subsea was set up by John Giddens and Mike Meade to design, build and own subsea vessels. John Giddens, who built Hallin Marine into a global subsea services player, re-entered the industry last year when he announced plans to build the new vessel. Hallin was sold to the US-based Superior Energy Inc in 2010 for more than £100 million. Tasik Toba is due to be delivered in the first quarter of 2017.
机译:在2015年8月25日于中国福州的福建马尾造船厂举行的仪式上,Tasik Subsea John Giddens的创始人兼首席执行官为Tasik Toba击中了第一批钢材。该公司表示,该船“已经提前”。这是一艘105m动态定位的3级海底船,具有内置饱和和空气潜水功能,具有完整的双遥控车辆功能。 Tasik Subsea由John Giddens和Mike Meade成立,负责设计,建造和拥有海底船只。约翰·吉登斯(John Giddens)将哈林海事(Hallin Marine)打造为全球海底服务业者,去年他宣布计划建造新船时重新进入该行业。哈林于2010年以超过1亿英镑的价格卖给了美国的Superior EnergyInc。 Tasik Toba将于2017年第一季度交付。

著录项

  • 来源
    《Offshore Support Journal》 |2015年第9期|12-12|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号