首页> 外文期刊>Offshore Support Journal >DUTCH-DESIGNED UNIT STARTS WORK ON DUTCH PROJECT WITH DUTCH OWNER
【24h】

DUTCH-DESIGNED UNIT STARTS WORK ON DUTCH PROJECT WITH DUTCH OWNER

机译:由荷兰人指定的单位开始与荷兰人一起进行荷兰项目

获取原文
获取原文并翻译 | 示例
       

摘要

August 2016 saw Van Oord's offshore installation vessel Aeolus install the final wind turbine on the Gemini offshore windfarm, a project that also saw Van Oord install 210km of export cables using another of its recently delivered assets, the cablelay vessel Nexus. Designed primarily for the installation of cables for offshore windfarms, Nexus is one of two DOC 8500 designs from Damen that have been commissioned to date. The other, Maersk Connector, is similar but not identical and is described elsewhere in this issue.
机译:2016年8月,Van Oord的海上安装船Aeolus在Gemini海上风电场安装了最后一台风力涡轮机,该项目还看到Van Oord使用其最近交付的另一件电缆铺设船Nexus安装了210公里的出口电缆。 Nexus主要设计用于安装海上风电场的电缆,是达门公司迄今已调试的两种DOC 8500设计之一。另一个是马士基连接器,相似但不相同,在本期其他地方对此进行了介绍。

著录项

  • 来源
    《Offshore Support Journal》 |2016年第8期|42-42|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号