【24h】

Continued from front

机译:从前续

获取原文
获取原文并翻译 | 示例
           

摘要

Tenders for engineering, procurement, installation and construction (EPIC) works, meanwhile, are expected to be released in 2012. In Sharjah, Dana Gas has announced EPIC tenders for the USD 120-150 million Zora gas field, which is expected to produce 60-90 million standard cubic feet per day for 25 years. Offshore projects such as these bode well for the OSV market over the next few months, although some companies have already been seeing favourable results since early this year. Egypt's Maridive and Oil Services, for instance, announced a 37% rise in first-half profits - mainly due to having secured more construction contracts - from a year earlier. It said it earned USD 36.2 million, before minority interests, between January and June, as compared to USD 26.4 million for the same period in 2010. This has made Maridive, the Middle East's biggest oil services firm by fleet size, confident of hitting its year-end revenue estimates, considering that its operations are offshore, and therefore not affected by the political turmoil in Egypt.
机译:同时,工程,采购,安装和施工(EPIC)工程的招标书预计将于2012年发布。在沙迦,达纳天然气公司(Dana Gas)宣布了针对120-1.5亿美元Zora气田的EPIC招标,该气田预计将产生60座-25天内每天-9千万标准立方英尺。尽管一些公司自今年初以来已经看到了良好的业绩,但这些离岸项目在未来几个月对OSV市场而言是一个好兆头。例如,埃及的Maridive and Oil Services宣布上半年利润同比增长了37%,这主要是由于获得了更多的建筑合同。它说,它在1月至6月赚取了3,620万美元(未计少数股东权益),而2010年同期为2,640万美元。按船队规模计算,这使中东最大的石油服务公司Maridive充满信心年终收入估算,考虑到其业务在海外,因此不受埃及政治动荡的影响。

著录项

  • 来源
    《Offshore marine monthly》 |2011年第10期|p.7-9|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号