When Total's Frigg field DP2 steel jacket was successfully brought to shore for dismantling and recycling after 30 years in service, it marked the first time that such a large jacket structure had ever been lifted up and towed to shore in a single lift without involving large offshore cranes or diving operations.rnRemoval of the DP2 jacket formed part of the Frigg field decommissioning contract awarded to Aker Solutions in Norway in October 2004 and successfully completed in July 2008. The standard way of removing such a structure would have involved a large offshore crane ship cutting and lifting the jacket in smaller pieces. Challenging this convention, however, Aker Solutions developed and patented a new method based around buoyancy tank assemblies installed on each of the Frigg DP2 jacket corner legs.
机译:服役30年后,道达尔的Frigg油田DP2钢护套成功地带到岸上进行拆解和回收利用时,这标志着这种大型护套结构首次被举起并通过一次升降机拖曳到岸上而没有涉及大型海上作业拆卸DP2护套是2004年10月授予挪威Aker Solutions的Frigg油田退役合同的一部分,并于2008年7月成功完成。拆除这种结构的标准方法将涉及大型海上起重机船。将夹克切成小块并提起。然而,挑战这一惯例的是,Aker Solutions开发了一种新方法并申请了一种新方法的专利,该方法基于安装在每个Frigg DP2夹克角脚上的浮力罐组件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号