【24h】

OFFSHORE ENGINEERING

机译:海洋工程

获取原文
获取原文并翻译 | 示例
           

摘要

Elaine Maslin surveys some of the plugging and abandonment solutions presented at Sintef's Experimental plugging and abandonment (P&A) Research for the North Sea event in Trondheim, Norway. David Lysne, Pro Venture's senior partner, addressing Sintef's Experimental P&A Research for the North Sea event in Trondheim, Norway, said that P&A was a huge cost for operators. Alexandra Bech Gj0rv, president and CEO at Sintef, told the Trondheim event that there were 4200 wells on the Norwegian Continental Shelf. Of those, only 250 had been plugged and abandoned, and another 1650 had been partially abandoned.
机译:Elaine Maslin对Sintef在挪威特隆赫姆举行的北海事件的实验性堵塞和遗弃(P&A)研究中介绍的一些堵塞和遗弃解决方案进行了调查。 Pro Venture的高级合伙人David Lysne在Sintef针对挪威特隆赫姆市北海事件的实验性P&A研究发表讲话时说,P&A对于运营商来说是一笔巨大的费用。 Sintef总裁兼首席执行官Alexandra Bech Gj0rv告诉特隆赫姆事件,挪威大陆架上有4200口井。其中只有250个被塞住并被遗弃,另外1650个被部分遗弃。

著录项

  • 来源
    《Oceanographic Literature Review》 |2017年第9期|2058-2064|共7页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号