机译:长江口北通道沿河沉积物运移机理及其对大规模干预的响应
State Key Laboratory of Estuarine and Coastal Research, East China Normal University, 3663 Zhongshan Rd. N., 200062 Shanghai, China,Institute for Marine and Atmospheric Research Utrecht, Utrecht University, Princetonplein 5, 3584 CC,Utrecht, the Netherlands;
Institute for Marine and Atmospheric Research Utrecht, Utrecht University, Princetonplein 5, 3584 CC,Utrecht, the Netherlands;
State Key Laboratory of Estuarine and Coastal Research, East China Normal University, 3663 Zhongshan Rd. N., 200062 Shanghai, China;
Shanghai Estuarine & Coastal Science Research Center, 1045 Xingsheng Rd, 201201 Shanghai, China;
residual flow; tidal pumping; stokes transport; sediment trapping; turbidity maximum; deep waterway project; north passage; yangtze estuary;
机译:长江口北通道沿河沉积物运移机理及其对大规模干预的响应
机译:形态学演变及其对北段导航改进的响应,长江河口
机译:长江口北通道台风丹佛对沉积物悬浮和迁移影响的综合模拟
机译:长江口北通道悬浮泥沙运移机理的水动力计算与分析
机译:中国长江口表层滩涂沉积物的重金属污染
机译:长江口潮间带沉积物氨氧化原核生物的群落动态和活性
机译:Kelvin-Helmholtz沿着长江河口北路的剪切不稳定引起的云
机译:重印的集合(路易斯安那州海湾的温度和盐度变化。阿拉巴马州海岸的夏季当前观测。路易斯安那州中部大陆架的沉积物运输:对发展中的阿查法拉亚河三角洲的影响。沿海海平面对路易斯安那州 - 德克萨斯州正面通道的响应货架。泻湖沉积物运输:Callianassa生物扰动的显着影响)。