首页> 外文期刊>Nuclear waste news >DOE Likely Not To Meet Projected Deadline At Idaho National Laboratory
【24h】

DOE Likely Not To Meet Projected Deadline At Idaho National Laboratory

机译:美国能源部可能无法达到爱达荷州国家实验室的预定期限

获取原文
获取原文并翻译 | 示例
           

摘要

Officials at the U.S. Department of Energy (DOE) report the agency likely will not meet its projected deadline for cleaning up radioactive liquid waste at the Idaho National Laboratory at Idaho Falls. Tom D'Agostino, DOE undersecretary for nuclear security, reported the expected failure is because of a delay in putting a facility constructed to treat and package the sodium-bearing waste into operation. DOE had hoped to have the Integrated Waste Treatment Unit (IWTU) working and treating 900,000 gallons of the waste for removal by Dec. 31.
机译:美国能源部(DOE)的官员报告说,该机构可能无法在爱达荷州爱达荷州国家实验室清理放射性液体废物的预计截止日期之前完成。能源部负责核安保的副部长汤姆·达戈斯蒂诺(Tom D'Agostino)报告说,预期的失败是由于推迟建设用于处理和包装含钠废物的设施而导致的。能源部曾希望让综合废物处理单位(IWTU)工作并处理900,000加仑废物,以便在12月31日之前将其清除。

著录项

  • 来源
    《Nuclear waste news》 |2012年第14期|p.8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号