首页> 外文期刊>Nuclear waste news >Teardown of Oak Ridge East Tennessee Technology Park Begun
【24h】

Teardown of Oak Ridge East Tennessee Technology Park Begun

机译:橡树岭东田纳西州科技园的拆毁开始

获取原文
获取原文并翻译 | 示例
           

摘要

Demolition is underway on the last laboratory facility remaining at Oak Ridge's East Tennessee Technology Park (ETTP), as progress continues toward completing all major teardowns at the one-time uranium enrichment complex by the end of this year. EM and cleanup contractor UCOR are demolishing the K-1006 Building, which was constructed in 1962 to support operations at the former Oak Ridge Gaseous Diffusion Plant. The structure is among the few unneeded buildings still standing at the site. As part of a deactivation process, teams removed asbestos and other waste from the building. Asbestos abatement presented challenges due to densely packed asbestos piping, making it difficult to access, but crews finished the work successfully.
机译:拆迁是在橡树岭东田纳西州科技园(ETTP)的最后一个实验室设施,随着今年年底完成一次铀浓缩复合体的所有重大拆迁,进展仍在继续。 EM和清理承包商UCOR正在拆迁K-1006建筑,该建筑于1962年构建,以支持前橡木岭气态扩散厂的操作。 这些结构是仍然站在该网站的少数不需要的建筑物之一。 作为停用过程的一部分,团队从建筑物中取消了石棉和其他废物。 由于稠密的石棉管道,石棉消除呈现挑战,使得难以访问,但船员成功完成了工作。

著录项

  • 来源
    《Nuclear waste news》 |2020年第2期|2-2|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号