The Emirates Nuclear Energy Corporation (ENEC) announced the completion of the construction of the concrete dome for the Barakah Unit 1 Reactor Containment Building. The completion of the dome marks the achievement of another on-time milestone in the complex construction of the UAE's first nuclear energy plant. The dome is the final structural component of the vast Reactor Containment Building (RCB), which now measures more than 70 metres (229 feet) in height. The RCB houses the nuclear reactor and is a critical structure in the nuclear plant's defence-in-depth barriers. RCBs are extremely robust in design; with thick concrete walls and heavy reinforcing steel, they rank among the strongest structures in the world. They are designed to confine and contain radiation, even in the most extreme circumstances. Overall, Unit 1 is now more than 60 per cent complete and on track to commence commercial operations in 2017, pending further regulatory approvals. The indicative timeline for the other nuclear energy plants is for Unit 2 to begin operations in 2018, Unit 3 in 2019 and the final Unit 4 in 2020.
机译:阿联酋核能公司(ENEC)宣布完成巴拉卡1号反应堆安全壳大楼混凝土圆顶的建造。圆顶的完成标志着阿联酋第一座核电站复杂建设中另一个准时里程碑的实现。圆顶是巨大的反应堆安全壳大厦(RCB)的最终结构部件,该建筑物的高度现已超过70米(229英尺)。 RCB容纳了核反应堆,是核电站纵深防御屏障中的关键结构。 RCB的设计非常坚固。它们具有厚实的混凝土墙和重型钢筋,是世界上最坚固的建筑之一。即使在最极端的情况下,它们也可以限制并抑制辐射。总体而言,第1单元现已完成60%以上,有望在2017年开始商业运营,尚待监管部门进一步批准。其他核电厂的指示性时间表是第2号机组将于2018年开始运行,第3号机组于2019年开始运行,最后一个4号机组将于2020年开始运行。

著录项

  • 来源
    《Nuclear Plant Journal》 |2015年第1期|10-10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号