首页> 外文期刊>Nuclear Plant Journal >I&C Commissioning of AP1000 Reactors in China
【24h】

I&C Commissioning of AP1000 Reactors in China

机译:中国AP1000反应堆的I&C调试

获取原文
获取原文并翻译 | 示例

摘要

The AMS testing of sensors and cables in China began by LCSR measurements on RTDs at cold shutdown. The LCSR tests at cold shutdown do not provide the response times of the RTDs; rather, they help determine if RTDs are properly installed in their thermowells. Any RTD that is found at cold shutdown to have installation or seating problems is removed from the thermowell and both the RTD and thermowell are cleaned and re-installed. The LCSR tests are then repeated to ensure that the problem is resolved. If the problem persists, then the RTD is replaced and this procedure is repeated until all RTDs are properly installed and seated in their thermowells. At the Sanmen and Haiyang plants, only a few RTDs had to be removed and reseated, or replaced, to yield optimum response times.
机译:在中国,传感器和电缆的AMS测试始于在冷停机时对RTD进行LCSR测量。冷关断时的LCSR测试无法提供RTD的响应时间。相反,它们有助于确定RTD是否正确安装在其热套管中。在冷停机时发现有安装或安装问题的任何RTD都将从热电偶套管中取出,并且RTD和热电偶套管都被清洁并重新安装。然后重复LCSR测试,以确保解决问题。如果问题仍然存在,则更换RTD,并重复此过程,直到正确安装所有RTD并将其放在其热套管中。在三门和海阳工厂,只需移除几个RTD,然后重新安置或更换它们,即可获得最佳的响应时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号