...
首页> 外文期刊>Nuclear news >Dominion contracts GE for long-lead components
【24h】

Dominion contracts GE for long-lead components

机译:Dominion与GE签订长铅组件合同

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Dominion Generation and GE Energy announced on May 1 that they have signed a contract for the procurement of large forgings and other components for what is referred to as "a possible new nuclear-powered generating unit," the ESBWR advanced boiling water reactor planned for the North Anna site in Virginia. Despite this decision, and the fact that it calls for Dominion to pay for the production of the components, Dominion— like every other potential new reactor customer in the United States at present— maintains that it has made no firm commitment to build a new power reactor.
机译:ESBWR先进沸水反应堆计划在5月1日宣布与Dominion Generation和GE Energy签署,他们已购买大型锻件和其他组件的合同,这些锻件和其他组件被称为“可能的新型核动力发电机组”。弗吉尼亚州的北安娜遗址。尽管做出了这一决定,并且要求Dominion支付组件的生产费用,但Dominion与目前美国其他潜在的新反应堆客户一样,仍然坚称它没有坚定地承诺要建设新的电力反应堆。

著录项

  • 来源
    《Nuclear news》 |2007年第7期|12-1420-2224-25|共8页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 原子能技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号