首页> 外文期刊>Nuclear news >International Briefs
【24h】

International Briefs

机译:国际简报

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The first four of basemat concrete at the haiyang site in China was completed on schedule on September 29. Westinghouse Electric Company and its consortium partner, the Shaw Group, had signed the final contracts for four AP1000s-two at Sanmen in Zhejiang Province,and two at Haiyang in Shandong Province-with a group of companies led by China's State Nuclear Power Technology Corporation in July 2007, and the first concrete pour ever for an AP1000 reactor was carried out at the Sanmen site in April of this year. The Haiyang site could hold another four reactors, and Westinghouse said that it is currently discussing plans for additional AP1000 plants to be sited inland of China's coastal areas.rnAccording to the announcement by Westinghouse, the pour at Haiyang encompassed over 5000 m~3 of concrete, 1200 tons of reinforcing steel, and 993 anchor bolts. The concrete will serve as the foundation for all of the nuclear island buildings, including the containment vessel and the shield building. The start of operation of the two Haiyang units is scheduled for May 2014 and March 2015.
机译:9月29日,中国海阳基地的前四批基础垫层混凝土如期竣工。西屋电气公司及其财团合作伙伴邵氏集团(Shaw Group)已签署了四台AP1000的最终合同,其中两套在浙江省三门市,另外两套在2007年7月,由中国国家核电技术公司牵头的一批公司在山东省海阳市进行了试验。今年4月,有史以来第一次将AP1000反应堆的混凝土浇筑在三门基地进行。海阳基地可能再容纳四个反应堆,西屋公司表示,目前正在讨论在中国沿海地区内陆增建AP1000电厂的计划。 ,1200吨的钢筋和993个地脚螺栓。混凝土将作为所有核岛建筑的基础,包括安全壳和护盾建筑。这两个海阳工厂计划于2014年5月和2015年3月开始运营。

著录项

  • 来源
    《Nuclear news》 |2009年第12期|34-36|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号