...
首页> 外文期刊>Nuclear news >Nuclear Notes
【24h】

Nuclear Notes

机译:核笔记

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The bad news came down to USEC Inc. in late July, when the Department of Energy informed the company that it was denying its application for a $2-billion loan guarantee for the American Centrifuge Plant (ACP), under construction near Piketon, Ohio. Instead, the DOE said that it would provide USEC with $45 million over 18 months for further research on the plant and for expanded cleanup at the shutdown Portsmouth Gaseous Diffusion Plant, also located at the Piketon site.rnThe loan guarantee denial was not expected, in large part because Barack Obama had supported the facility during his presidential campaign in 2008. He had said in a letter to Ohio Gov.
机译:不幸的消息传到了USEC Inc.,7月底,美国能源部告知该公司,该公司拒绝为位于俄亥俄州Piketon附近的美国离心机厂(ACP)申请20亿美元的贷款担保。美国能源部表示,它将在18个月内向USEC提供4,500万美元,用于对该厂的进一步研究以及扩大停产的朴茨茅斯气体扩散工厂的清理工作。朴茨茅斯气体扩散工厂也位于派克顿工厂。很大程度上是因为巴拉克·奥巴马(Barack Obama)在2008年总统竞选期间曾支持该设施。他在给俄亥俄州政府的一封信中说。

著录项

  • 来源
    《Nuclear news》 |2009年第10期|4|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 ger
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号