首页> 外文期刊>Nuclear news >Nrc Finds Four Violations Of Qa Requirements
【24h】

Nrc Finds Four Violations Of Qa Requirements

机译:Nrc发现违反质量保证要求的四项

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

After being suspended for a year at the request of STP Nuclear Operating Company (STPNOC), technical reviews are again being carried out by the Nuclear Regulatory Commission on the company's application for combined construction and operating licenses (COL) for South Texas-3 and -4. The NRC, which on February 10 granted STPNOC's request that it resume work on the application (AW, Mar. 2009, p. 19), is treating the design for the Toshiba ABWRs as an amendment within the COL process and is not requiring a separate design certification. (The certified ABWR design is by GE Hitachi Nuclear Energy and includes proprietary aspects not available to Toshiba.) On the downside, however, was a March 2 report on an NRC inspection conducted in January in which STPNOC was cited for four violations of quality assurance requirements in the control of documents for Units 3 and 4.
机译:在应STP核运营公司(STPNOC)的请求而被暂停一年之后,核监管委员会再次对该公司对南德克萨斯3号和-的联合建造和运营许可证(COL)的申请进行技术审查。 4。 NRC在2月10日批准了STPNOC的要求,要求它恢复该申请的工作(AW,2009年3月,第19页),该公司将东芝ABWR的设计视为COL流程中的一项修正,并且不需要单独进行设计认证。 (经过认证的ABWR设计是由GE Hitachi Nuclear Energy提供的,并且包括东芝无法获得的专有方面。)但是,不利的一面是3月2日关于1月份进行的NRC检查的报告,其中STPNOC因四次违反质量保证而被引用第3单元和第4单元的文件控制要求。

著录项

  • 来源
    《Nuclear news》 |2009年第4期|p.23-24|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号