...
首页> 外文期刊>Nuclear news >Nuclear power plant maintenance assigned its own track of sessions
【24h】

Nuclear power plant maintenance assigned its own track of sessions

机译:核电站维护分配了自己的会议记录

获取原文
获取原文并翻译 | 示例

摘要

The 2011 Utility Working Conference, sponsored by the ANS Operations and Power Division, was held August 14-17 in Hollywood, Fla. Four new technical session tracks were added this year, one of which was devoted to nuclear power plant maintenance. Certain topics can overlap multiple areas of interest, however, and the maintenance track joined with the tracks on work/project management and engineering to provide two sessions titled "Managing Our Workload." These sessions mostly dispensed with formal presentations in favor of a facilitated open discussion. In the first, participants were encouraged to state the most urgent issues or impediments in workload management, and in the second, they tried to arrive at ways to overcome them.
机译:由ANS运营和电力部赞助的2011年公用事业工作会议于8月14日至17日在佛罗里达州好莱坞举行。今年增加了四个新的技术会议路线,其中一个专门用于核电站的维护。但是,某些主题可能会覆盖多个感兴趣的领域,并且维护轨道与工作/项目管理和工程轨道一起提供了两个会议,名为“管理我们的工作量”。这些会议大部分都没有正式的演讲,而是有利于进行公开讨论。首先,鼓励参与者陈述工作负载管理中最紧迫的问题或障碍,其次,他们试图找到克服这些问题的方法。

著录项

  • 来源
    《Nuclear news 》 |2011年第11期| p.81-828486| 共4页
  • 作者

    E. Michael Blake;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号