...
首页> 外文期刊>Nuclear news >Notes on the 201 I World List of Nuclear Power Plants
【24h】

Notes on the 201 I World List of Nuclear Power Plants

机译:关于201 I世界核电厂清单的说明

获取原文
获取原文并翻译 | 示例

摘要

The following is a summary of changes and developments that occurred during 2010 and an update on the status of pending projects, with explanations of judgment calls on what has (or has not) been included. Argentina: Construction of Atucha-2 is essentially complete. Turbine testing was scheduled for February 2011. Nucleoelectrica Argentina S.A. has stated its intention to begin commercial operation by the end of this year, but this list uses 2012 as a startup date. Plans for new plant projects, which might use reactors imported from Canada or Argentina's own CAREM design, are still in development.
机译:以下是2010年期间发生的变化和发展的摘要,以及未决项目的最新状态,并解释了对已包含(或未包含)内容的判断。阿根廷:Atucha-2的建造已基本完成。涡轮机测试定于2011年2月进行。阿根廷Nucleoelectrica公司已表示打算在今年年底之前开始商业运营,但该清单使用2012年作为启动日期。仍在制定新工厂项目的计划,这些项目可能使用从加拿大进口的反应堆或阿根廷自己的CAREM设计。

著录项

  • 来源
    《Nuclear news 》 |2011年第3期| p.46| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号