首页> 外文期刊>Nuclear news >Dome removed from heavy-water test reactor
【24h】

Dome removed from heavy-water test reactor

机译:从重水测试反应堆中卸下圆顶

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The 75-foot-tall rusty-orange dome of the Heavy Water Components Test Reactor— known at the site as "Hector"—was removed on February 1 as part of a $25-mil-lion reactor decommissioning and deactiva-tion project at the Department of Energy's Savannah River Site (SRS), in Aiken, S.C. Preparations for the removal of the dome and the decommissioning of the reactor began in October 2009. Since then, DOE contractor Savannah River Nuclear Solutions has had a crew of about 35 employees—including riggers, mechanics, engineers, designers, and crane operators—working on the project.
机译:重水成分测试反应堆的75英尺高的生锈橙色圆顶(在现场称为“赫克托”)于2月1日被拆除,这是该基地耗资2500万美元的反应堆退役和停用项目的一部分。能源部位于南卡罗来纳州艾肯的萨凡纳河工地(SRS)于2009年10月开始了拆除圆顶和反应堆退役的准备工作。从那时起,DOE承包商萨凡纳河核能解决方案公司已有约35名员工,包括装配工,机械师,工程师,设计师和起重机操作员-在该项目上工作。

著录项

  • 来源
    《Nuclear news》 |2011年第3期|p.94-95|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号