【24h】

Power Briefs

机译:电源简介

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The final eis for indian point license renewal was issued on December 3 by the Nuclear Regulatory Commission. This completes the NRC staff's documentation related to Entergy Nuclear Operations' application to renew the operating licenses of Units 2 and 3 at the Indian Point site near Buchanan, N.Y. The Westinghouse-design pressurized water reactors, rated at 1035 MWe and 1048 MWe, have licenses that would expire in 2013 and 2015. Renewal would defer the expiration of each license by 20 years. Supplement 38 to NUREG-1437, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, was published in three volumes, with a total of 2195 pages, to accommodate the number of public comments on the draft EIS. The public hearing, with perhaps 17 admitted contentions, may be held before the end of this year.
机译:核监管委员会于12月3日发布了换取印度点许可证的最终eis。这样就完成了NRC工作人员与Entergy核行动有关的申请,以续签位于纽约布坎南附近的Indian Point站点的2号和3号机组的运行许可证。西屋公司设计的压力水反应堆(额定功率为1035 MWe和1048 MWe)已获得许可该许可证将在2013年和2015年到期。续签会将每个许可证的到期时间推迟20年。 NUREG-1437补编38,《核电厂许可证更新的一般环境影响声明》分三册出版,共2195页,以容纳对EIS草案的公众意见。可能在今年年底之前举行公开听证会,可能有17个被承认的争论。

著录项

  • 来源
    《Nuclear news》 |2011年第1期|p.30|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号