首页> 外文期刊>Nuclear news >NRC issues confirmatory action letter on restart plans
【24h】

NRC issues confirmatory action letter on restart plans

机译:NRC发布重启计划确认行动信

获取原文
获取原文并翻译 | 示例
           

摘要

The extent of tube wear in the recently installed steam generators at San Onofre-2 and -3 has prompted the Nuclear Regulato-rnry Commission to issue a confirmatory action letter to Southern California Edison Company (SCE), giving regulatory force to commitments made by the company to learn the cause of the unusual wear and to address the condition before either reactor resumes power operation. Unit 3 was shut down on January 31 because of a release of radioactive steam caused by a leak in a steam generator tube (AW, Mar. 2012, p. 28). Since then, tests conducted by SCE have found leaks in eight Unit 3 tubes (AW, Apr. 2012, p. 83).
机译:最近在San Onofre-2和-3处安装的蒸汽发生器中管子的磨损程度促使核规制委员会向南加州爱迪生公司(SCE)发出确认行动函,从而赋予了监管权以保证公司了解异常磨损的原因,并在任一反应堆恢复供电之前解决问题。 1月31日,由于蒸汽发生器管泄漏导致放射性蒸汽释放而关闭了3号机组(AW,2012年3月,第28页)。此后,由SCE进行的测试发现8个3号管泄漏(AW,2012年4月,第83页)。

著录项

  • 来源
    《Nuclear news》 |2012年第6期|p.202224|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号