...
首页> 外文期刊>Nuclear news >Part 21 issues found by three companies
【24h】

Part 21 issues found by three companies

机译:三家公司发现的第21部分问题

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Curtiss-Wright Flow Control Company notified the Nuclear Regulatory Commission on January 4 that all testing and repairs have been completed on a type of assembly used in TopWorx C7 and SV7 switches. In keeping with 10 CFR Part 21 of NRC regulations, the company reported last April that QualTech NP Top Potted Generation 3 quick-disconnect connector pin side assemblies were found not to fulfill submergence qualifications. Since then, all of the affected assemblies have been returned (from power reactors in China, and also from Entergy's Pilgrim boiling water reactor in Massachusetts, where they had not been put to use). All of them have now been modified, and, according to Curtiss-Wright, "We have experienced 100 percent success when repair was needed."
机译:Curtiss-Wright流量控制公司于1月4日通知核监管委员会,已经对TopWorx C7和SV7交换机中使用的一种组件进行了所有测试和维修。为了符合NRC法规的10 CFR第21部分,该公司去年4月报告称,发现QualTech NP顶部灌封的第3代快速断开连接器插针侧组件不符合浸入资格。从那时起,所有受影响的组件都被退回(从中国的动力堆,以及麻萨诸塞州Entergy的朝圣者沸水反应堆,尚未投入使用)。所有这些现在都已被修改,并且根据Curtiss-Wright的说法,“当需要维修时,我们获得了100%的成功。”

著录项

  • 来源
    《Nuclear news》 |2012年第2期|p.62|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号