...
首页> 外文期刊>Nuclear news >ATMEAI design chosen for second nuclear power plant
【24h】

ATMEAI design chosen for second nuclear power plant

机译:ATMEAI设计被选为第二座核电站

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

During an official visit to Ankara in early May, Japanese Prime Minister Shinzo Abe signed an agreement with Turkish Prime Minister Recep Tayyip Erdogan that grants Japan exclusive negotiating rights to conclude a contract for the construction of Turkey's second nuclear power station, to be located in the northernmost province of Sinop, on the Black Sea. The two prime ministers announced the agreement at a press conference that followed the signing on May 3. Turkey chose the ATMEAI reactor technology for the project, which will be undertaken by a Japanese-French consortium led by Mitsubishi Heavy Industries (MHI) and GDF Suez. The consortium, which also includes the Japanese power company Itochu, is expected to be joined by the Turkish electricity generation company EUEAS. The project will include four nuclear units and is valued at $22 billion. ATMEAI is an 1100-MWe class Generation Ⅲ+ pressurized water reactor developed by ATMEA, a joint venture of MHI and France's Areva. Construction is anticipated to begin in 2017, with the first unit to be completed in time for the country's centennial anniversary in 2023.
机译:在5月初对安卡拉进行正式访问期间,日本首相安倍晋三与土耳其总理雷杰普·塔伊普·埃尔多安(Recep Tayyip Erdogan)签署了一项协议,授予日本专有的谈判权,以缔结建造位于土耳其的第二座核电站的合同。位于黑海最北端的锡诺普省。两国首相在5月3日签署的新闻发布会上宣布了该协议。土耳其选择了该项目的ATMEAI反应堆技术,该技术将由三菱重工(MHI)和GDF苏伊士牵头的日本-法国财团承接。 。该财团还包括日本电力公司伊藤忠(Itochu),预计土耳其发电公司EUEAS也将加入该财团。该项目将包括四个核子单位,价值220亿美元。 ATMEAI是由ATHI开发的1100-MWeⅢ+级压水堆,这是三菱重工与法国阿海珐公司的合资企业。预计建设将于2017年开始,第一台设备将在2023年该国成立一百周年之时及时完成。

著录项

  • 来源
    《Nuclear news》 |2013年第7期|73-77|共5页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号