...
【24h】

Fuel Briefs

机译:燃料简介

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The gas hills project has received a record of decision (ROD) from the Bureau of Land Management's Lander Field Office. The ROD authorizes Power Resources Inc., doing business as Cameco Resources, to develop uranium deposits in Wyoming's Fremont and Natrona Counties using in situ recovery. Included in the plans are injection, production, and monitoring wells; well field header houses; pipelines; power lines; access roads; disposal ponds; and satellite facilities. The project was approved with changes that allow for additional on-site processing and require additional environmental protection measures and monitoring to prevent "undue or unnecessary degradation of public lands." The initial public scoping for an environmental impact statement was conducted in the fall of 2010. The draft EIS was made available for comment in the fall of 2012, and the final EIS was released in the fall of 2013.
机译:天然气山项目已收到土地管理局的Lander外地办事处的决定记录(ROD)。 ROD授权Power Resources Inc.(与Cameco Resources开展业务)使用原位回收在怀俄明州的Fremont和Natrona县开发铀矿床。计划中包括注入井,生产井和监测井;井田联箱管道;电力线路;通路;处置池;和卫星设施。该项目的变更得到批准,可以进行更多的现场处理,并需要采取其他的环境保护措施和监控,以防止“过度或不必要的公共土地退化”。环境影响声明的初步范围界定是在2010年秋季进行的。EIS草案于2012年秋季公开征求意见,最终的EIS于2013年秋季发布。

著录项

  • 来源
    《Nuclear news》 |2014年第4期|74-74|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号